Complete Bathroom Refurb

Completely stripped out to bare walls, new tile effect wall panel throughout, new suite, new shower cubicle, new floor, minor plumbing adjustments, new towel radiator, and extractor fan. Completed in 5 days and all the tiles and old suite taken away the same week.

Rotten Decking Supports

Lovely composite decking with rotten supports. Stripped back and 24 joists replaced. Decking relaid and power washed ready for the next tenant’s safety. The excessive gaps are down to how the decking was installed originally, (not by us) and not terribly well done in the first place.