Rapid job to keep the tenants dog enclosed. New feather edge board fence. New posts.
Boxing pulled off by plumber to fix a leak so we re-boxed in using uPvc at the customers request. Fixed with screws and white caps for access in the future. Easy clean surface now and lots of pipes to cut around.
Quick fix for a blank wall and now its starting to look more like a fireplace. More work to be done here.
All these shelves, pine wall unit, mantle shelf and clock installed this afternoon. It’s a work in progress kitchen.
The old gate was held up with cable ties and was about to fall apart. New posts and gate fitted this morning with sympathy for the beech hedge around it.
A smashed fixed-frame shower enclosure was removed and replaced with a beautiful, crystal clear glass screen with a hinged deflector. Transforms the look of this shower room.
A tired looking and wobbly fence. New posts and a lick of paint and a vast improvement. Far less than replacing the whole fence.
Dangerous caravan steps replaced with a decking platform for a lovely elderly couple..
Lovely composite decking with rotten supports. Stripped back and 24 joists replaced. Decking relaid and power washed ready for the next tenant’s safety. The excessive gaps are down to how the decking was installed originally, (not by us) and not terribly well done in the first place.
Removed 5m x 3.5m of decking to expose a rather good patio, the decking had turned into a rat hotel and was even badly chewed in places. We done the heavy work and the customer will do the finishing touches.
